Pool Engineering, Inc. 1201 N. Tustin Ave. Anaheim, CA 92807
Office Hours: Monday – Thursday 8:00am to 5:00pm and Friday 8:00am to 2:00pm
Contact Us at: Ph: (714) 630-6100 Fx: (714) 630-6114 Email: info@pooleng.com
Driving Directions
Links:

|
Home \ Water Seepage through Shotcrete or Gunite Pool Shell \ Vanishing Edge & Perimeter Overflow Pools - Design, Engineering & Construction \ Content Detail \ Concrete Reinforcement & Engineering \ Soild & Geotechnical Issued in Swimming Pool Construction Pool Engineering
Soil & Geotechnical Issues in Swimming Pool Construction
Tuesday, November 2, 2010

Int'l Pool Spa Patio Expo, Las Vegas, Nevada, Oct 31 – Nov 5, 2010
http://www.poolspapatio.com/ind/landing-page.aspx
Soil and Geotechnical Issues in Swimming Pool Construction
Tuesday, Nov 2, 8:00am to 10:00am Presented by: Ron Lacher, P.E.
Course Description: Underlying soil and geotechnical problems are often the cause of most serious swimming pool structural distress. In this seminar, attendees will learn about the most common of these problematic soil and geological conditions and how to mitigate them to avoid serious damage to swimming pool structures.
Attendees will learn:
- Recognize the most common detrimental geotechnical conditions that affect swimming pools.
- Discover the best methods to mitigate these problematic soil conditions.
- Find out about the critical Building Code geotechnical requirements affecting swimming pool construction.
|